• AutoTL;DR@lemmings.worldB
    link
    fedilink
    English
    arrow-up
    3
    ·
    1 year ago

    This is the best summary I could come up with:


    The Labour MP Meg Hillier, who chairs the public accounts committee, said Raac was “the tip of the iceberg” of maintenance issues within the school estate.

    She questioned why the situation had been “left to deteriorate for so long”, telling Times Radio: “In both schools and hospitals, there hasn’t been enough money going into buildings and equipment.”

    Matthew Byatt, the head of the Institution of Structural Engineers, said any high-rise buildings with flat roofs constructed between the late 1960s and early 1990s could contain Raac.

    The DfE’s U-turn – which means all buildings or areas with Raac must close – follows instances where the material collapsed despite it being considered low risk.

    Speaking to BBC Radio 4’s Today programme on Friday, the schools minister, Nick Gibb, said the department had discovered a “number of instances” over the summer.

    Sarah Skinner, the chief executive of Penrose Learning Trust, which has three affected schools, told the Today programme on Saturday that the notification on Thursday seemed “very late in the day”.


    The original article contains 812 words, the summary contains 169 words. Saved 79%. I’m a bot and I’m open source!